Quantity Surveying Course
Training/Coaching/Tuition by AL Madina Institute of Quantity SurveyHyderabad |
| Medium of instruction: | English |
Syllabus:
Manual & Computer Training with M.S Office Excel Sheet & Auto-Cad
Topics under Quantity Surveying:
1.Types of footings.
Plain footing, Step footing, Isolated footing, Plain Combined footing, Shoe-footing, Isolated Combined footing, Raft footing, Pile footing, etc.
2.Types of columns.
Square or Rectangular Column, Circular Column, L-type column, T-type column, V-type column, Arc-type column, Hexagon type column, Y-type, Link or Stub column, etc.
3.Types of beams.
Tie Beam, Strap Beam, Plinth Beam, Drop Beam, Inverted Beam, Cantilever Beam, Con-sealed Beam, etc.
4.Types of Slabs.
Flat Slab, Conventional Slab, One-way Slab, Two-way Slab, Hardy Slab, Waffle Slab, Hollow core rib-slab, Pitch Roof, Slab with arches, Sun-ken Slab or Depressed slab, Low roof, Loft or Chajja, Dome Slab, Post-tension slab, Pre-tension slab, Cable Suspension Slab, Grade Slab, Sun-Shade, Kitchen Platform, etc.
5.Types of walls.
Brick Masonry wall (10cm & 20cm thick), C.R.S wall, R.R.S wall, Shear wall, Retaining wall, Drop wall, Load bearing wall, Pre-cast wall, Curtain wall, Core-wall, Parapet wall, Boundry wall or Compound wall, etc
6. Types of Stair cases
7. Types of Ramps
8. Earth work Excavation & Back-fill Calculations
9. Unit conversion-one/two/three -dimension conversion.
10. Length calculation.
11. Area calculation.
12. Volume calculation.
13. Module-I -Sub-structure calculation [Item below ground level].
14. Module-II -Super-structure calculation [item above ground level].
15. Module-III -Reinforcement calculation for R.C.C and Steel structure.
16. Module-IV -Computer Application (MS Excel sheet and Auto-cad).
17. Module-V -Project work.
We customize courses as per your requirement
1. Module-I (Detail Calculations for the Sub-Structure items)
1. R.C.C, for Footings
2. P.C.C,under Footings
3. Neck column
4. Tie beam and Strap beam
5. P.C.C,under Tie beams
6. Plinth beam or Ground Beams.
7. P.C.C.under Plinth Beams
8. Retaining wall
9. P.C.C,under Retaining wall
10. Water calculation
11. Rectangular sump
12. Circular sump
13. Septic tank
14. Lift pit
15. Earth work Excavation calculation
16. Back- Fill calculation
17. Abstract for the Quantity of Sub-structure.`
18. Bill of Quantities
19. Concrete proportions and Ratios with mix-design
20. Area of shuttering in m2
21. Area of bitumen paint in m2
22. Area of termite control in m2
23. Area of polythene sheet or Vapour Barrier in m2
24. Reinforcement in Kgs or Tones
2. Module-II (Detail Calculation for the Super Structure Items)
1. Floor columns
2. Floor beams
3. Floor slabs
4. Stair cases (Typical & Semi-Circular)
5. Ramp (Straight & Semi-Circular)
6. Parking plat-form
7. Brick work (No. of bricks required)
8. Cement: Mortar required for brick work & Plastering
9. Wall putty calculation
10. Paint calculations in Litres (Emulsion paint & Enamel paint)
11. False-Ceiling Calculations in m2
12. Flooring Calculations (Marble tiles, Vitrified tiles, Parking tiles & inter-lock tiles)
13. Wall Skirting Calculations
14. Wall Tiles (Ceramic Tiles) calculations
15. Wood calculations for doors & windows
16. Doors & Windows Fittings (Tower bolt, door handle etc)
17. Windows grill, Glass, and Iron gate calculations
18. Over-Head Water tank Calculations
19. Plumbing & Sanitation Details
20. Expansion Joint Details
21. Calculations for Pre-cast Walls, Columns, Slabs etc.
22. Calculation for the miscellaneous item (Lintel, Loft (Chajjas), Window Sunshade & Kitchen Platforms).
23. Abstract for the quantities of super structure
24. Bill of quantities for super structure
25. Honey Comb details
All Calculation on MS Excel Sheet (Computer)
Bill of Quantities
Submittal report for the approval of materials
Project Stages Report
Project Deliverables Report
Weekly Report & Monthly Report
Variations
Value Engineering Meeting
Minutes of Meeting
Workshop
Tender Documentation
Procurement
New Batch Commencement & Course Details
Note:(Course Duration 60 working Days)
I. Quantity Surveying Classes at Head office, Malakpet, for new Batch will start on Thursday 20th March 2014.
the Class-time for new batch is at 02:00 pm to 05:00 pm After noon .
Students can enroll their names before 15th March 2014
Fees Rs 20000 can be paid in Two Installments " at the time of admission 50% and after one month 50% amount has to paid.
| Classroom - Regular | ||||
| When | Duration | Where | Remarks | Price |
|
20th March, 2014 (2:00 PM - 5:00 PM) |
60 Days |
Malakpet, Hyderabad (Head Office) | Students can enroll their names before 15th March ... more |
INR 20,000 Per Course (Taxes As Applicable) |
| Price Notes: Fee can be paid in Two Installments at the time of admission 50 percent and after one month 50 percent amount has to paid. | ||||
AL Madina Institute of Quantity Survey
This Institute takes pride in 15 years of experience, providing First Class Teaching and Guidance Services in all disciplines of Civil Engineering Field.



