Search in
Courses Providers, List Your Courses for FREE
Menu

Quantity Surveying Course


Training/Coaching/Tuition

by AL Madina Institute of Quantity Survey


Hyderabad
Starting from:
INR 20,000
Per Course
(Taxes As Applicable)
Request Info
Subjects Covered & Categories
Learn: Quantity Surveying

Category: Civil Engineering


Basic Details
Medium of instruction:English
Overview, Content & Syllabus

Syllabus:

Manual & Computer Training with M.S Office Excel Sheet & Auto-Cad

Topics under Quantity Surveying:

1.Types of footings.

Plain footing, Step footing, Isolated footing, Plain Combined footing, Shoe-footing, Isolated Combined footing, Raft footing, Pile footing, etc.

2.Types of columns.

Square or Rectangular Column, Circular Column, L-type column, T-type column, V-type column, Arc-type column, Hexagon type column, Y-type, Link or Stub column, etc.

3.Types of beams.

Tie Beam, Strap Beam, Plinth Beam, Drop Beam, Inverted Beam, Cantilever Beam, Con-sealed Beam, etc.

4.Types of Slabs.

Flat Slab, Conventional Slab, One-way Slab, Two-way Slab, Hardy Slab, Waffle Slab, Hollow core rib-slab, Pitch Roof, Slab with arches, Sun-ken Slab or Depressed slab, Low roof, Loft or Chajja, Dome Slab, Post-tension slab, Pre-tension slab, Cable Suspension Slab, Grade Slab, Sun-Shade, Kitchen Platform, etc.

5.Types of walls.

Brick Masonry wall (10cm & 20cm thick), C.R.S wall, R.R.S wall, Shear wall, Retaining wall, Drop wall, Load bearing wall, Pre-cast wall, Curtain wall, Core-wall, Parapet wall, Boundry wall or Compound wall, etc

6. Types of Stair cases

7. Types of Ramps

8. Earth work Excavation & Back-fill Calculations

9. Unit conversion-one/two/three -dimension conversion.

10. Length calculation.

11. Area calculation.

12. Volume calculation.

13. Module-I -Sub-structure calculation [Item below ground level].

14. Module-II -Super-structure calculation [item above ground level].

15. Module-III -Reinforcement calculation for R.C.C and Steel structure.

16. Module-IV -Computer Application (MS Excel sheet and Auto-cad).

17. Module-V -Project work.

We customize courses as per your requirement

1. Module-I (Detail Calculations for the Sub-Structure items)

1. R.C.C, for Footings

2. P.C.C,under Footings

3. Neck column

4. Tie beam and Strap beam

5. P.C.C,under Tie beams

6. Plinth beam or Ground Beams.

7. P.C.C.under Plinth Beams

8. Retaining wall

9. P.C.C,under Retaining wall

10. Water calculation

11. Rectangular sump

12. Circular sump

13. Septic tank

14. Lift pit

15. Earth work Excavation calculation

16. Back- Fill calculation

17. Abstract for the Quantity of Sub-structure.`

18. Bill of Quantities

19. Concrete proportions and Ratios with mix-design

20. Area of shuttering in m2

21. Area of bitumen paint in m2

22. Area of termite control in m2

23. Area of polythene sheet or Vapour Barrier in m2

24. Reinforcement in Kgs or Tones

2. Module-II (Detail Calculation for the Super Structure Items)

1. Floor columns

2. Floor beams

3. Floor slabs

4. Stair cases (Typical & Semi-Circular)

5. Ramp (Straight & Semi-Circular)

6. Parking plat-form

7. Brick work (No. of bricks required)

8. Cement: Mortar required for brick work & Plastering

9. Wall putty calculation

10. Paint calculations in Litres (Emulsion paint & Enamel paint)

11. False-Ceiling Calculations in m2

12. Flooring Calculations (Marble tiles, Vitrified tiles, Parking tiles & inter-lock tiles)

13. Wall Skirting Calculations

14. Wall Tiles (Ceramic Tiles) calculations

15. Wood calculations for doors & windows

16. Doors & Windows Fittings (Tower bolt, door handle etc)

17. Windows grill, Glass, and Iron gate calculations

18. Over-Head Water tank Calculations

19. Plumbing & Sanitation Details

20. Expansion Joint Details

21. Calculations for Pre-cast Walls, Columns, Slabs etc.

22. Calculation for the miscellaneous item (Lintel, Loft (Chajjas), Window Sunshade & Kitchen Platforms).

23. Abstract for the quantities of super structure

24. Bill of quantities for super structure

25. Honey Comb details

All Calculation on MS Excel Sheet (Computer)

Bill of Quantities

Submittal report for the approval of materials

Project Stages Report

Project Deliverables Report

Weekly Report & Monthly Report

Variations

Value Engineering Meeting

Minutes of Meeting

Workshop

Tender Documentation

Procurement

New Batch Commencement & Course Details

Note:(Course Duration 60 working Days)

I. Quantity Surveying Classes at Head office, Malakpet, for new Batch will start on Thursday 20th March 2014.

the Class-time for new batch is at 02:00 pm to 05:00 pm After noon .

Students can enroll their names before 15th March 2014

Fees Rs 20000 can be paid in Two Installments " at the time of admission 50% and after one month 50% amount has to paid.


Course Schedule & Price
Classroom - Regular
When Duration Where Remarks Price
20th March, 2014
(2:00 PM - 5:00 PM)
60 Days
Malakpet, Hyderabad (Head Office) Students can enroll their names before 15th March ... more INR 20,000
Per Course
(Taxes As Applicable)
Price Notes: Fee can be paid in Two Installments at the time of admission 50 percent and after one month 50 percent amount has to paid.

Venues (Locations)
Hyderabad, Malakpet (Head Office):- Office No.411, 4th Floor Tirumula Tower, Malakpet, Hyderabad - 500036, Andhra Pradesh, India


About Course Provider

AL Madina Institute of Quantity Survey


This Institute takes pride in 15 years of experience, providing First Class Teaching and Guidance Services in all disciplines of Civil Engineering Field.

Browse similar courses by category





Courses by AL Madina Institute of Quantity Survey
Civil Engineering


AllRefer.com - Browse and Share Photos
Browse & Share Photos
Subscribe & get details about interesting courses & events free in your mail